almost move in ready

I learned a lot designing and watching this project come together. I really like the look and can't wait to "move in."
 The glass panels for the shower enclosure will be installed Monday, and then there is some tile work at the transition to be installed and grouted. 







By the end of next week the bathroom should be complete, and the kitchen, mudroom and master bedroom flooring should be installed. 

Comments

  1. I dare say you are ready to be over going upstairs for a shower.

    ReplyDelete

Post a Comment

Popular Posts